Gold Member Since 2010
Audited Supplier
Qingdao Higrade Moulds & Products Co., Ltd.

Punching Mould, Progressive Die, Precision Mould manufacturer / supplier in China, offering Stamp Die/Competitive Stamp Tool (C13), Metal Stampings/ Stamping Tooling (C38), Stamping Die/Tooling/Progressive Precision Die (HRD09135) and so on.

(/ )

Supplier Homepage Product Single stamping dies Stamp Die/Competitive Stamp Tool (C13)

Stamp Die/Competitive Stamp Tool (C13)

FOB Price: US $5,000 / Set
Min. Order: 1 Set
Min. Order FOB Price
1 Set US $5,000/ Set
Get Latest Price
Port: Qingdao, China
Production Capacity: 500sets/Year
Payment Terms: L/C, T/T

Request a custom order and have something just for you!

Send Customized Request
Basic Info
  • Model NO.: HRD-C13
  • Processing Type: Metal Spinning
  • Mould: Simple Single Process Dies
  • Industry: Metal Stamping Parts
  • Customized: Customized
  • Certificate: ISO9001:2008
  • Brand: Higrade
  • Transport Package: Wooden Case
  • Origin: Qingdao, China
  • Type: Cold Stamping
  • Material: Stainless Steel
  • Process: Forming Process
  • Tolerances: 0.2mm
  • Place of Origin: Qingdao,China
  • Manufacture Experience: More Than 11 Years
  • Trademark: Higrade
  • Specification: ISO9001: 2008
  • HS Code: 8480410090
Product Description
Product name: Stamping Die/Stamp Mold/Stamped Mould /Stamp Tooling Place of origin: Qingdao, China

1) We specialize in sheet metal stamping parts, metal stamping die, sheet metal moulds, including the progressive mould. We had export some sheet metal progressive moulds to Japan, Italy, England, Germany, USA, Russia, South America etc.
2) The sheet metal parts are related to home appliance, auto parts, electronic products, and so on.
3) ISO9001: 2008 certified by SGS.

Item Description:
1) Staming die material: CR12MOV, SKD61, SKD11, SKH-9, 45# etc.
2) Cavity: Single/Multiple
3) Drawing format: . Igs, . Step, . X_t, . Pdf, . Dwg, . Dxf,
4) Metal parts material: Iron plate, SPCC, SUS304, SECC, AL, CU etc.
5) Mould life: 50000~500000 shots
6) First trial time: 20~35 days after mould structure drawing confirmed
StepItemDescription
1QuotationWe offer you the mould and part quotation according to your details(drawing or sample,material,quantity,weight).
2OrderIf our quotation is competitive,you will place the order.
3Drawing designWe design the mould structure drawing according to your product drawing or sample,then send to you for confirmation.
4Mould makingAfter your confirmation of our drawing,we begin to make the moulds,during manufacturing program,we send you mould building progress with pictures every week,for you to know our process.
5First trialWe will make the mould first trial on time, then send you video, picture and samples for you to confirm.
6Quality confirmYou will confirm our mould quality according to sample. If you need to adjust the product structure,we can help you change the mould further.
7DeliveryShip the mould after it is completely OK,packed by wooden case.
Send your message to this supplier
Avatar
Mrs. Shirney Chen
Sales Manager
*From:
To: Mrs. Shirney Chen
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

Find Similar Products By Category